Rivers Edge Water Line Replacement

Project Manager: Leila Momezadeh
Office Phone:  (505) 891-5048
Email:  lmomenzadeh@rrnm.gov
Contract Company: New Concepts Inc.
Cost: $ 737,517.07
Stage:  Construction
Schedule: May 2017 - September 2017
Rivers Edge Water Line Replacement
The project includes water line replacement and roadway reconstruction of Rivers Edge Drive, Gila River Road, Silver Creek Drive, and Butte Way. A new 8” water line will be installed including new copper services to the residents. The road work consists of milling the existing pavement surface, subgrade preparation, the installation of 4" of base course, and 3" of asphalt.

Status Log:


  • June 2017: The main water line has been installed on Rivers Edge Dr, Gila River Rd, Silver Creek Dr, Butte Way, and the system was connected to Riverside Dr main line at Silver Creek Drive.
  • May 2017: The Pre-Construction meeting was held on May 3, 2017. Construction will begin on May 15, 2017.
  • April 2017: Governing Body Advice and Consent.