Industrial Park Water Line

Project Manager: Gillie Lopez
Office Phone: (505) 891-5049
E-Mail: glopez@rrnm.gov
Contract Company: WSP USA
Cost: $  1,915,862.56
Stage: Construction
Schedule: January 2019 - May 2019
Industrial Park
The Industrial Park Water Line will construct a new 16” diameter ductile iron water line including fire hydrants and replace water meters along the Frontage Road between Sundt Road and Northern Boulevard. In addition to the water line in the Frontage Road, this project includes new water line crossings under NM 528 at the intersections of Sundt Road, Rockaway Boulevard, Quantum Road, and Northern Boulevard. The water line crossings under NM 528 will be constructed in steel casings using trench-less installations. This project includes ten (10) connections to existing water lines within the Industrial Park Loop area.

Additional Information:


Status Log:

  • November 2018: Project is going to the Governing Body for Advice and Consent in December 2018.
Adobe Disclaimer: Reading the PDF documents provided on this site requires the Adobe Acrobat Reader, available for free from Adobe. Adobe, the Adobe logo, Acrobat, and the Acrobat logo are trademarks of Adobe Systems Incorporated.