This is a Hybrid Mill & Inlay paving project that will replace the existing asphalt with new pavement and create an improved road base. This is phase 1 of a project that is intended to address residential roadways throughout the community in need of maintenance beyond crack patch and sealing work.
September 18, 2023: District 2 begins at Rebecca Loop
Adobe Disclaimer: Reading the PDF documents provided on this site requires the Adobe Acrobat Reader, available for free from Adobe. Adobe, the Adobe logo, Acrobat, and the Acrobat logo are trademarks of Adobe Systems Incorporated.