Abrazo Road Rehabilitation Project

Project Manager: Bill Ladd
Office Phone: (505) 891-5032
E-Mail: bladd@rrnm.gov
Contract Company: Albuquerque Asphalt, Inc.
Cost: $192,667.96
Stage: Construction
Schedule: March 6, 2023 - March 2023
Abrazo Rd. Picture

This is a Hybrid Mill and Fill project to remove the existing asphalt roadway surface by milling and incorporating the milling into the sub-grade creating a base course material and paving a new asphalt roadway surface with new striping, In addition new A.D.A. compliant curb ramps will be constructed. 

While work is taking place on Abrazo Road NE between Idalia Road NE and Unser Blvd., roadway travel will be limited to to one direction/one lane at different intervals, and access from adjacent roadways will be restricted.  Access to businesses will be maintained.  Detour signs will be posted.

Status Log:

  • March 2023: Notice to Proceed


Traffic Control Abrazo
Adobe Disclaimer: Reading the PDF documents provided on this site requires the Adobe Acrobat Reader, available for free from Adobe. Adobe, the Adobe logo, Acrobat, and the Acrobat logo are trademarks of Adobe Systems Incorporated.